Factory Audit Checklist: Trace One Lot in Korea
Use a factory audit checklist to trace one comparable lot in Korea, verify the inspection evidence, and decide whether to proceed, pilot or hold.

A factory audit checklist should help you make an order decision, not just record what machinery you saw. Before releasing a first production order in Korea, select one recent lot comparable to your part and trace it through the actual manufacturing site, drawing revision, inspection results and defect handling. Then record which controls you verified, which failed and which you could not see.
This checklist is for overseas buyers checking a supplier’s quality controls and production capability. Have your quality or engineering lead set the acceptance criteria. A tour, a management-system certificate and the acceptance inspection for your future shipment answer different questions.
Before the visit: What should you ask for?
Send the part number, controlled drawing revision, order quantity and two or three characteristics that matter to fit, function or safety. Define comparable before the meeting: for a machined bracket, a prior lot may qualify if it used a similar material, machining method and tolerance, even if it belongs to another customer. Confirm the production address, who handles any outsourced step, and what records your reviewer can see. Agree in advance on redaction and photography.
Copyable request: “For our planned order of [quantity] under drawing [part/revision], could we choose a recent comparable lot from a short list during the visit and follow it from material receipt to final release? Please confirm the production address and any outside processing. We’d like to see the job traveler, the inspection record for [characteristic], the gauge record and a redacted example of how you handle a failed check. Please tell us what can be reviewed on site and what may be photographed.”
If the quote names a trading company, ask who will make the parts and who will authorize changes before booking the trip. See the difference in who sells your order and who actually makes it.
What does the ISO 9001 certificate tell you?
An ISO 9001 certificate covers the named organization’s quality management system within a defined scope. It is not approval of your bracket, tolerance or lot, and ISO itself does not issue certificates. Ask for the certificate number and any site schedule. Compare the legal name, site address and scope against the work you are buying. Verify current status and, if accredited certification is required, check that the issuer’s accreditation covers the applicable scope. Verify an accredited certificate through IAF CertSearch or through the issuer using independently sourced contact details. If a search returns no match, confirm the name and number with the issuer and leave the result unverified until you have confirmation. See ISO’s certificate verification guidance and the joint ISO/IAF note on expected outcomes.
Three certificate checks before the visit
- 01 · ENTITYWho is certified? Match the legal name and certificate number to the issuer’s record.
- 02 · SITEWhere is the work done? Match the production address to the certificate or its site schedule.
- 03 · SCOPEWhat is covered? Check the purchased work and current status, plus issuer accreditation if required.
On the factory floor: Follow one lot, not a tour route
Ask to select a recent comparable lot from the supplier’s list instead of looking only at a showcase sample. Work backward from a packed label or release record, then forward from the material lot. A job traveler is the record that follows work through production. Paper or digital is fine; what matters is that the identifiers and dates join up.
| Checkpoint | Evidence to compare | If the evidence does not match |
|---|---|---|
| Site and outside processing | Traveler lists the site and steps; subcontract dispatch and return records identify the same job or lot. | Resolve which site handles the critical operation and who checks it on return. |
| Material and revision | Match the material batch or certificate reference to the stock label and traveler. Match the controlled drawing revision at the workstation to the job release. | Ask how mixed material and obsolete drawings are prevented; record the precise missing link. |
| Actual measurement | Compare a recorded value to its drawing tolerance. Match the gauge ID and confirm its calibration was current on the inspection date and its range and resolution suit the job. | Escalate a missing or unsuitable measurement method to your quality lead; a pass stamp cannot settle it. |
| Defect and shipment release | Follow a rejected unit to the hold area or system block, then see the approved disposition. If reworked, check the reinspection; if scrapped or accepted by concession, check the disposition and any approval required. | Ask for a redacted record or later demonstration. An unobserved control is not a pass. |
Follow the record for lot L-042
- Site and outside processing Match the job or lot across the traveler and any subcontract dispatch and return records.
- Material and drawing revision Match the stock batch and current drawing revision to the job release.
- Measurement and gauge Compare 7.97 mm with the allowed 7.95–8.05 mm. Check that G-17 was in calibration on the inspection date and suitable for the measurement.
- Hold, disposition and release If a unit failed, trace the hold and approved disposition. Check reinspection if reworked, or the recorded disposition and approvals if scrapped or accepted by concession.
Illustrative example: A drawing calls for a hole diameter of 8.00 ±0.05 mm. An inspection record for lot L-042 shows 7.97 mm against an allowed 7.95–8.05 mm, recorded with gauge G-17. That reading falls inside the tolerance band. If the gauge was out of calibration on the inspection date or its suitability for the measurement is unclear, do not accept the reading as evidence of capability. Ask the supplier to show a suitable method and have your quality lead agree on the evidence needed. Even a trustworthy in-tolerance reading on one prior lot does not establish process capability or authorize release of your shipment. NIST’s process capability guide explains why the spread of a stable process matters.
After the visit: Proceed, approve a pilot, or hold?
Send a one-page record with the site and date, the sampled lot, the drawing revision, each key finding, and the evidence you reviewed. Mark each check verified for the sample, failed, or not verified. For a gap, set a named owner, target date and the specific evidence needed to close it. Keep ‘not available’ distinct from ‘failed’; a redacted live review can resolve a visibility gap without exposing another customer’s records.
- Proceed under agreed controls: The sampled evidence supports your key requirements, and your team has approved the production package and first-order acceptance plan.
- Conditional pilot only: Mandatory and safety-critical requirements have been resolved, but a noncritical gap remains. Agree to the pilot quantity, acceptance criteria, owner, due date and a written hold on full production until the buyer approves the evidence.
- Hold: The production site, a safety-critical capability, mandatory evidence or material identity remains unresolved. Get the missing proof before authorizing production.
Example follow-up: Gauge evidence not verified · Supplier quality lead · Before pilot approval · Show G-17’s calibration record and the approved measurement method · Buyer quality lead owns the release decision.
Which order decision does the evidence support?
- Proceed Key controls are verified for the sample, and the buyer has approved the production package and acceptance plan.
- Conditional pilot only Mandatory and safety-critical requirements are resolved. Set acceptance criteria and keep a written hold on full production pending buyer approval.
- Hold Mandatory evidence or a critical site, safety or material question remains unresolved. Do not authorize production.
Keep this walkthrough record separate from the shipment release. When your actual order is made, use the agreed acceptance plan and match the inspection report to the lot being shipped.
Official sources
- ISO: Certification and verification
- ISO and IAF: Expected outcomes of accredited ISO 9001 certification
- IAF CertSearch: certificate status, scope and site details
- NIST: What is process capability?
Need someone on the ground in Korea?
Korea Ops Desk can contact the supplier in Korean, coordinate site access and interpretation, and document what was shown and what still needs a response. Keep technical acceptance with your own team or qualified reviewer.
Send the supplier name or link, part number and drawing revision, the specific check you need, and your preferred window. A redacted excerpt or a short summary is enough to start. You can reach out at any hour.
See factory visit support · Message Korea Ops Desk on WhatsApp · Send the visit brief · colin@koreaopsdesk.com